下载此文档

TPM方法.ppt


文档分类:汽车/机械/制造 | 页数:约38页 举报非法文档有奖
1/38
下载提示
  • 1.该资料是网友上传的,本站提供全文预览,预览什么样,下载就什么样。
  • 2.下载该文档所得收入归上传者、原创者。
  • 3.下载的文档,不会出现我们的网址水印。
1/38 下载此文档
文档列表 文档介绍
TPM方法
TPM
RELIABILITY INDICATOR = MTBF (mean time between failure)
It is the average duration in minutes during which the machine or the installation functioned without any stoppages.
The stoppages are:
- machine breakdowns
- breakdowns related to tools
- breakdowns related to the product
- stoppages for change-overs (used or broken)
- stoppages for frequent adjustments
- stoppages for inspection (SPC sampling)
- stoppages for maintenance Stoppages for tool change-overs are not taken into account
TPM
BREAKDOWNS AND MICRO-STOPPAGES:
BREAKDOWNS
Stoppages >= 5mins
Not often
Systematically noted
Stoppage affects the entire working group
Intervention of an expert
Research necessary before start-up
Identifiable causes
MICRO-STOPPAGES
Stoppages < 5mins
Often
Not noted
Little or no perception by the group
Easy start-up without elimination of the cause (suppression of the effect)
Non identified causes
Little motivation to eliminate them because little perceived impact on production
Strongly involve the operators and automatic installation people for tasks without Added Value
TPM
DATA COLLECTIONS
BREAKDOWN RECORDS OF THE LAST 6 MONTHS
PRODUCTION NOTEBOOKS
OPERATOR EXPERIENCE
THE DATE OF THE LAST TECHNICAL MODIFICATION DONE ON ONE PART OF THE MACHINE
Pareto of unsolved breakdowns of the last 12 months
Eliminate from this database the solved breakdowns
Priority is to solve breakdowns that represent the highest stoppages
Repetitive breakdowns must be highlighted
breakdown1
breakdown2
breakdown3
breakdown4
breakdown5
breakdown6
TPM : Breakdowns
Pareto analysis of breakdowns
TPM: BREAKDOWNS
TREATMENT METHODOLOGY
Register the anomalies (including the breakdowns)
Carry out the repairs
Define the actions to avoid recurrence
Confirm the cause
Steering: Supervisor
Execution: Maintenance Prof. / Workshop Technician
Method: Management of operations and spare parts
Steering: Supervisor
Execution: Maintenance Prof.

TPM方法 来自淘豆网m.daumloan.com转载请标明出处.

相关文档 更多>>
非法内容举报中心
文档信息
  • 页数38
  • 收藏数0 收藏
  • 顶次数0
  • 上传人SSL2021
  • 文件大小1018 KB
  • 时间2021-10-17