下载此文档

广汕铁路红花嶂隧道贯通.pdf


文档分类:建筑/环境 | 页数:约1页 举报非法文档有奖
1/1
下载提示
  • 1.该资料是网友上传的,本站提供全文预览,预览什么样,下载就什么样。
  • 2.下载该文档所得收入归上传者、原创者。
  • 3.下载的文档,不会出现我们的网址水印。
1/1 下载此文档
文档列表 文档介绍
现 代 隧 道 技 术
隧道单层衬砌结构水压力特征研究
MODERN TUNNELLINineering, Southwest Jiaotong University, Chengdu 611756)
: There have been substantial research results on the material properties and structural stress state of tunnel
Abstract
single-layer lining. However, limited studies have been done on the distribution characteristics of water pressure. In
view of this, taking the single-layer shotcrete lining structure and composite sandwich lining structure as the re⁃
search subjects, this paper deduces the water pressure calculation formula to analyze the pattern of how different fac⁃
tors, such as permeability coefficient of the shotcrete layer and thickness of the single-layer lining, affect the water
pressure, based on the seepage continuity equation and Darcy′s law. The results show that: (1) when carrying out the
design of single-layer linings, measures should be taken to reduce the permeability coefficient of the surrounding
rock, such as surrounding rock grouting, and necessary drainage measures shall also be taken, without too much em⁃
phasis placed on the seepage resistance of the outer shotcrete layer, so as to reduce the water pressure of the single-
layer lining structure; (2) the thickness of the single-layer lining should be minimized as much as possible, with the
recommended thickne

广汕铁路红花嶂隧道贯通 来自淘豆网m.daumloan.com转载请标明出处.

非法内容举报中心
文档信息
  • 页数1
  • 收藏数0 收藏
  • 顶次数0
  • 上传人宝钗文档
  • 文件大小1.12 MB
  • 时间2022-07-08