下载此文档

2007年5月翻译资格考试三级笔译真题.doc


文档分类:资格/认证考试 | 页数:约9页 举报非法文档有奖
1/9
下载提示
  • 1.该资料是网友上传的,本站提供全文预览,预览什么样,下载就什么样。
  • 2.下载该文档所得收入归上传者、原创者。
  • 3.下载的文档,不会出现我们的网址水印。
1/9 下载此文档
文档列表 文档介绍
2007年5月翻译资格考试三级笔译真题
第一部分英译汉
It took nine years from the time the Danish and Swedish governments agreed to build a fixed link between their countries to the time the first car, train, truck and bicyclists crossed the Oresund Bridge.
Construction of the bridge, including design and cornerstone, began in March 1991 and pleted in July 2000. Today, it is the longest stone-stayed road and rail bridge in the world. At approximately 10 miles (16 kilometers), including the tunnel, it is an engineering and architectural marvel. But as time has proven, the bridge is a cultural and economic boon as well. The sleek span of concrete whose design typifies Scandinavian minimalism has contributed greatly to the development of the Oresund region: the eastern part of Denmark, including Copenhagen, and the southwestern part of Sweden, including Malmöand Lund.
The level muting between Malmöand Copenhagen has quadrupled since the opening of the bridge in 2000, and the number of Danes moving to the south of Sweden has increased sixfold. The Oresund region has e a cultural and economic powerhouse, considered a model region by the European Union.
Work on the bridge began in 1995, and was undertaken by a team of international consulting and panies.
From the beginning, construction of the plied with some of the
world’s toughest environmental regulations, as well as many advanced design and co

2007年5月翻译资格考试三级笔译真题 来自淘豆网m.daumloan.com转载请标明出处.

相关文档 更多>>
非法内容举报中心
文档信息
  • 页数9
  • 收藏数0 收藏
  • 顶次数0
  • 上传人mh900965
  • 文件大小36 KB
  • 时间2017-06-24