[4] E H Martin,K pressed air work with tunnelboring machines[J].Underground Space﹣The 4th Dimensionof Metropolises,2007:1175 -1181.[5] [J].建筑机械化,2013 (6):85 -87.(FU shieldpressure brought into warehouse operation safety technicalmeasures[J].Construction Mechanization,2013(6):85 -87.(in Chinese))[6] 石新栋,[J].隧道建设,2011,31 (6):652 -656,667.(SHI Xindong,WU conditions andconstruction countermeasures of Weisanlu river﹣crossingshield﹣bored tunnel in Nanjing [J].Tunnel Construction,2011,31(6):652 -656,667.(in Chinese))[7] [J].隧道建设,2013,33 (2 ):147 -150.(ZHANG on technical difficulties in construction of Yangtzeriver﹣crossing tunnel on Weisan road in Nanjing[J].TunnelConstruction,2013,33(2):147 -150.(in Chinese))[8] 吴忠善,杨钊,[J].隧道建设,2014,34(7):673 -678.(WU Zhongshan,YANG Zhao,YANG onand application of technologies for cutting tool replaementunder hyperbaric condition in super large diameter slurryshield boring[J].Tunnel Construction,2014,34(7):673 -678.(in Chinese))[9] [J].建筑监督检查与造价,2008(10):36 -39.(CAI safetycertication technology of the entrance &operation in pressurechamber for slurry shield[J].Supervision Test and Cost ofConstruction,2008(10):36 -39.(in Chinese))[10] 程明亮,何峰,
宁波地铁将应用大断面矩形盾构法隧道技术 来自淘豆网m.daumloan.com转载请标明出处.