several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measuremen〕
㎡
阴角摸板〔租赁〕
m
塑钢门窗
〔80型材,单玻4mm厚、龙虎品牌〕
㎡
钩头螺栓
套
塑钢门窗
〔80型材,双玻4mm厚、华塑品牌〕
㎡
木模板〔租赁〕
张
塑钢门窗
〔80型材,双玻4mm厚、龙虎品牌〕
㎡
木架板〔租赁〕
块
防盗门
〔亨博、盼盼、大象〕
道
油膏
㎡
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
主要人工费报价单
人工费名称
单位
单价〔元〕
砖砌体
m3
外墙贴砖
㎡
内墙抹灰
㎡
涂料
㎡
地坪
㎡
模板
㎡
混凝土
㎡
投标资料表格样本 来自淘豆网m.daumloan.com转载请标明出处.